Ribbon Cutting at Oak Hill School

Image 14 copy
Image 19 copy

On Tuesday, September 9th, we celebrated the ribbon cutting of Oak Hill School's new Track and Field during their Homecoming football game! 

HASTINGS has partnered with The Oak Hill School and First Presbyterian Church since 2022 to design a new 8-lane TSSAA regulation track and field that will elevate the campus’s athletic and recreational offerings. Designed for football, soccer, lacrosse, and track, the facility features synthetic turf and precise striping to accommodate multiple sports. Spectator amenities are thoughtfully integrated to enhance the experience for both athletics and school-wide events. Terraced seating, bleachers, and a 3,500-square-foot viewing pavilion provides flexible viewing options, while a dedicated restroom building ensures convenience for visitors.

Congratulations to the entire project team and partners. We are so excited to watch this facility become an integral part of the school's campus!

Architecture, Interior Design, Planning, and Sustainability

Architecture, Interior Design, Planning, and Sustainability